{"id":565,"date":"2025-10-12T19:35:36","date_gmt":"2025-10-12T18:35:36","guid":{"rendered":"https:\/\/www.mykambala.co.uk\/?p=565"},"modified":"2025-11-04T02:56:57","modified_gmt":"2025-11-04T02:56:57","slug":"falcon-road-tunnel-update-12-10-2025","status":"publish","type":"post","link":"https:\/\/www.mykambala.co.uk\/?p=565","title":{"rendered":"Falcon Road Tunnel update (12\/10\/2025)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The work started on Monday 21 July 2025 with support from partners including Network Rail and Shopstop and should be finished in December 2025. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Please note that sometime the bus stop where 170, 344, 315, 345, C3, 295 and 49 could be closed depending on which side of the street the work is taking place.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<figure class=\"wp-block-boldblocks-youtube-block\"><div id=\"yb-video-g-DGRRbr16E\" class=\"yb-player\" data-video-id=\"g-DGRRbr16E\" data-title=\"Play\" style=\"background-image:url(https:\/\/img.youtube.com\/vi\/g-DGRRbr16E\/hqdefault.jpg)\"><button type=\"button\" class=\"yb-btn-play\"><span class=\"visually-hidden\">Play<\/span><\/button><\/div><figcaption class=\"yb-caption\">Transforming Battersea&#8217;s Falcon Road Bridge with winning design<br><br>Kambala RA took part in the workshops to design the Bridge at St-Peter Church Battersea and Providence House<\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"http:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474422831-768x1024.jpeg\" alt=\"\" class=\"wp-image-464\" srcset=\"https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474422831-768x1024.jpeg 768w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474422831-225x300.jpeg 225w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474422831-1152x1536.jpeg 1152w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474422831.jpeg 1280w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"http:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474439049-768x1024.jpeg\" alt=\"\" class=\"wp-image-465\" srcset=\"https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474439049-768x1024.jpeg 768w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474439049-225x300.jpeg 225w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474439049-1152x1536.jpeg 1152w, https:\/\/www.mykambala.co.uk\/wp-content\/uploads\/2025\/04\/1744474439049.jpeg 1280w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The works include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>New artwork cladding along the length of both walls underneath the bridge<\/li>\n\n\n\n<li>Enhanced lighting<\/li>\n\n\n\n<li>Pigeon-proofing<\/li>\n\n\n\n<li>New paint to the bridge structures<\/li>\n\n\n\n<li>Landscaping to the south side of the bridge<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Access during works<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To safely carry out the works we have to install temporary traffic signals under the bridge to allow work to take place on one side at a time. One pedestrian footway will remain open throughout the works, with pedestrian crossings provided at either end.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Buses<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Working closely with Transport for London, we have managed to minimise the impact on bus services during the works, however some services will be impacted at times. TfL will advertise all service information at the bus stops affected and details can be found on the&nbsp;<a href=\"https:\/\/tfl.gov.uk\/modes\/buses\/?cid=buses\">TfL website<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Roadworks<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To ensure better traffic flows through the area, Wandsworth Council and TfL will not permit any non-emergency roadworks on the diversion routes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The work started on Monday 21 July 2025 with support from partners including Network Rail and Shopstop and should be finished in December 2025. Please note that sometime the bus stop where 170, 344, 315, 345, C3, 295 and 49 could be closed depending on which side of the street the work is taking place. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-565","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=565"}],"version-history":[{"count":2,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/565\/revisions"}],"predecessor-version":[{"id":574,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/565\/revisions\/574"}],"wp:attachment":[{"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mykambala.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}